Intelligent renewables

The engineering firm that follows your plants from site assessment to the permit: permit documentation ready in weeks and every project under control.

The problem

Every month of design is a month without a permit.

Today a permit application file typically takes 8–12 weeks and an engagement of €50–80k. Scattered documents, requests for additions that restart the process, weeks of a stalled project while the land and the grid connection offer wait.

  • ClientGot time for a quick call?
  • ColleagueShall we sync up?
  • DesignerWhich is the latest version?
  • ClientWhere are we with the application?
  • ColleagueDid you see the latest PEC?

Design and permitting cost

€50–80k

Time to the application file

8–12 weeks

One week after another, with the project on hold.

Certified email (PEC) · accumulated delay

+4 months

  • PECRequest for additions+1 month
  • PECRequest for additions+1 month
  • PECRequest for additions+2 months

Illustrative examples.

How it works

Engineering expertise, accelerated by software.

You send us the documents. We analyse them and design. Our engineers review and sign. You receive the complete application file, with every value traceable to its source.

  1. Step 1 of 5 · Documents

    The documents you already have

    Send us the KMZ, the grid connection offer (STMG) and the land registry extracts as they are. No need to tidy them up: we start from there.

  2. Step 2 of 5 · Processing

    Every document, checked

    Our firm analyses every document of your project, finding and resolving inconsistencies before the authorities flag them.

  3. Step 3 of 5 · Parameters

    Every value with its source

    Area, capacity, voltage, cadastral sheet and parcels: every value carries the document and the page it comes from.

  4. Step 4 of 5 · Design

    From design to application file

    We turn your ideas into a complete permit application file, ready for submission.

  5. Step 5 of 5 · Review and signature

    Reviewed and signed

    Before delivery, our in-house licensed engineers review and sign every document.

Fewer errors, more traceability, better coordination, shorter lead times.

Example: Single Authorisation (AU) for a 30 MW ground-mounted solar plant
AspectTraditional firmRisma
Preparing the application file8–12 weeks3 weeks
Indicative cost€50–80k€30–45k
Document checksManual reviews and spot checksSystematic checks of data, references and consistency, with review by the engineer
Application statusEmail and shared Excel filesPlatform with up-to-date task status
Handling inconsistenciesOften found in later reviewsCross-checks during preparation
Review and signatureLicensed engineerLicensed engineer
  • The weeks refer to preparing the application file, not to the time the authority takes to grant the permit.
  • Indicative values to be confirmed on your project: timing and price are written into the quote.
  • Documents are reviewed and signed by licensed engineers before delivery.
  • Your documents do not train models.

Same signature. A different method.

Talk to our engineers

Projects in progress

Managing projects in permitting

A platform to check the status of each application, organise the documentation and monitor communications and deadlines, with our engineers supporting the technical work.

Portfolio in permitting
  • AU · Ground-mounted solar 30 MWRequest for additional informationDocumentation in preparation
  • PAS · Agrivoltaic 4.9 MWpUnder reviewNo action required
  • AU · BESS 20 MWGrid connection offerAcceptance deadline in 12 days

Illustrative example.

  • Application status

    For each project, the stage of the permitting route, the documents filed and the next steps.

  • Organised documentation

    Drawings, certified emails and attachments collected in the project, with every value traceable to its source.

  • Communications and deadlines

    Communications from the authorities linked to the application and deadlines in view.

  • Requests for additional information

    We analyse the authorities' requests and prepare the technical documentation required, checked and signed by the competent professionals.

Tell us about your project

A call with one of our engineers: permitting route, timing and indicative cost for your project.

Risma calendar

Call with one of our engineers · video call

Loading availability…

Or send us the documents

KMZ and STMG, or the documents the project already has. Within 24 hours we confirm the permitting route and timing.

Project files (optional)

KMZ or KML of the site, or the cadastral list in XLSX or CSV (municipality, sheet, parcel); also the grid offer in PDF, DOCX or ZIP · up to 20 files, 50 MB in total · We use the files only to reply to you, then we delete them.

Frequently asked questions

What is Risma?

An engineering firm that prepares permit application files for solar, agrivoltaic and BESS projects, from site due diligence to filing, with a method that checks every value against every document. Our engineers decide, review and sign.

Who signs the documents?

Our licensed engineers, registered with their professional body, review and sign every document before delivery.

Why less than half the time?

Our method rebuilds the permitting route and checklists from the documents and checks every value across all documents: the engineers work on decisions, not on looking for information.

Which plants and permitting routes?

Ground-mounted PV, agrivoltaic, BESS, from 500 kW to utility scale; PAS, AU, PAUR, VIA and screening.

Are the documents ready for filing?

Yes, after review and signature by our engineers and your approval.

Can I send confidential documents?

Yes, we handle them with the confidentiality of an engineering firm, and they do not train models.